Province | Subbasin | % |
---|---|---|
Columbia Cascade | Methow | 40.00% |
Wenatchee | 60.00% |
Previous: | Next: |
---|---|
56662 REL 42: 1996-040-00 EXP COHO RESTORATION MID-COLUMBIA - SITE DVLPMNT |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | B: 119. Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow | 11/01/2015 | 11/01/2015 | |
Continue to develop SAs and BA addendums as needed for supplemental sites | C: 165. Support NEPA/SEPA compliance through SAs and/or EAs and additional USFWS/NMFS ESA consultation | 01/31/2016 | 01/31/2016 | |
Design level drawings and permitting for acclimation sites | D: 175. Produce design and specifications to include permitting for Methow sites | 04/30/2016 | ||
Design level drawings and permitting for acclimation sites | E: 175. Produce design and specifications to include permitting for Wenatchee sites | 04/30/2016 | ||
Develop and secure agreements for acclimation within conservation easements | F: 98. Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow | 09/30/2015 | 09/30/2015 | |
Water right applications to be submitted to WSDOE; secure water rights | H: 154. (Mod. 1 rev.) Submit water right applications to WSDOE | 04/30/2016 | 04/30/2016 | |
Natapoc FH | I: 175. Natapoc FH facility | 01/30/2016 | 01/30/2016 | |
Butcher Creek dredging in fall of 2015 | J: 61. Butcher Creek sediment dredging-summer/fall of 2015 | 10/30/2015 | 10/30/2015 | |
develop test well | K: 171. Mod. 1: Test Well at Early Winters Acclimation site | 03/31/2016 | 03/18/2016 | |
develop test well | L: 171. Mod. 1: Test Well at Trinity Acclimation site | 03/31/2016 |
Primary Focal Species | Work Statement Elements |
---|---|
Coho (O. kisutch) - Unspecified Population |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2015 | ||||||
B | 119 | Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow | 02/01/2015 | ||||||
C | 165 | Support NEPA/SEPA compliance through SAs and/or EAs and additional USFWS/NMFS ESA consultation | 02/01/2015 | ||||||
D | 175 | Produce design and specifications to include permitting for Methow sites | 02/01/2015 | ||||||
E | 175 | Produce design and specifications to include permitting for Wenatchee sites | 02/01/2015 | ||||||
F | 98 | Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow | 02/01/2015 | ||||||
G | 132 | [No Report Required] | 02/01/2015 | ||||||
H | 154 | (Mod. 1 rev.) Submit water right applications to WSDOE | 02/01/2015 | ||||||
I | 175 | Natapoc FH facility | 02/01/2015 | ||||||
J | 61 | Butcher Creek sediment dredging-summer/fall of 2015 | 02/01/2016 | ||||||
K | 171 | Mod. 1: Test Well at Early Winters Acclimation site | |||||||
L | 171 | Mod. 1: Test Well at Trinity Acclimation site |